Use these measurements to prepare an initial quote request. Label each dimension as the existing door slab, frame or rough opening so the team knows what you measured. Confirm final fabrication dimensions against the approved drawings before ordering or changing the opening.
For a replacement, include photos of both sides of the opening and the surrounding trim. Review replacement installation planning and the quote checklist before sending your dimensions.
The frame size is the outside dimension of the steel frame we build. The rough opening is the hole in the wall it goes into, which has to be slightly larger so the frame can be shimmed plumb and square. The door size is smaller again, because it sits inside the frame.
For most of our doors the rough opening runs about half an inch wider and taller than the frame. The exact figure is printed on the shop drawings for your door, and those drawings are what a framer should build to. If you give us a rough opening that already exists, we size the frame to it, so tell us which number you are giving us.
Level means the sill is flat side to side. Plumb means the jambs are perfectly vertical, both left to right and front to back. Square means every corner is a true 90 degrees.
A steel frame is rigid. It will not bend to follow a crooked opening the way a wood frame can be persuaded to, so the opening needs to meet the tolerances specified for your frame. Flag uneven or bowed areas for review before fabrication or installation.
Measure the whole opening as one unit, not each piece. For a pair of doors we need the total width and height, and whether both leaves need to operate or one can be fixed most of the time. For sidelites and transoms, give us the full opening and tell us the door width you want. We work out the sidelite and transom sizes from there, because the mullions between them take up room that is easy to miss. See the double doors, sidelite doors and transom doors pages for configurations.
Most installation problems are opening problems. The door itself is finished and checked before it leaves the shop, so what decides how install day goes is the hole it is going into. Here is what we need to see when we arrive.
The project readiness checklist covers all of this in a form you can print and walk the site with.