INSTALLATION
We install the doors we build. Same company, same crew, from the first tape measure to the last bead of sealant.
That is worth saying plainly, because plenty of steel doors sold in Texas get shipped to the customer and handed off to whoever the builder can find that week. When the frame is out of plumb by a quarter inch, nobody wants to own it.
A steel door is not a light thing. A single entry unit with insulated glass runs several hundred pounds and a patio wall runs into the thousands. It has to go in square and plumb or it will never seal properly, and once the frame is anchored you do not really get a second try. That is the entire argument for having the people who welded it also set it.
If you are searching for steel door installers near you in Austin, Dripping Springs, Lakeway or anywhere in Central Texas, this page covers how the work actually runs: what is included, how long it takes, and what happens on install day.
GET YOUR FREE QUOTEInstallation is part of the door price, not a line item bolted on at the end. Every job includes:
The quoted price also covers the manufactured door, jamb, glass and threshold, so there is no second invoice from a subcontractor afterwards. See the FAQ for what else is bundled in.
From first call to installed door is usually a little under two months. Most of that is fabrication time, not site time.
1. We come out and measure
Someone from our team measures the opening on site. Not you with a tape over the phone. Openings in older Austin houses are rarely square, and the difference between the top and the bottom of a twelve-foot patio opening is exactly the sort of thing that ruins a door built off a guess.
2. CAD drawings, then your approval
You get drawings of the actual unit before anything is cut. Glass, muntin layout, frame profile, finish, handles and lockset all get picked at this stage. Nothing goes into production until you sign off and a 50% deposit is in.
3. Fabrication in our shop
Frames are welded, ground and finished in house, then glazed and hung so the leaves are adjusted before they ever leave the building. Figure six to eight weeks from approved drawings.
4. Delivery and site prep
The unit comes out on our truck. We need driveway or side-yard access wide enough to walk it in, and we mask floors and any finished stone around the opening before the old door comes out.
5. Install day
Old door out, opening squared, new frame set, shimmed, plumbed and anchored. Then threshold, weather stripping and sealant, then the leaves get hung and adjusted until they swing and latch the way they should. Hardware goes on last.
6. Walkthrough before we leave
We open and close everything with you, show you how the multipoint hardware works, hand over keys and clean up. If something needs a further adjustment after the house settles into it, we come back.
A single or double entry door is a one-day job in almost every case. A wide patio run or a set of steel windows is more often two. The crew arrives in the morning, masks off floors and any finished stone around the opening, and the old unit comes out first.
Your entry will be open to the outside for part of that day, so it is worth putting pets somewhere else and moving anything valuable back from the doorway. We do not leave a house open overnight. If a job is going to run into a second day, the opening gets closed and secured before the crew leaves.
What we need from you is simple: clear access from the street or driveway to the opening, and somewhere to stage a unit that may be twelve feet wide.
Most of our installations are replacements, not new builds. We measure the rough opening you already have and build the unit to it, which means the stone, stucco or brick surround does not need to be cut back or rebuilt. That is normally the cheapest way to get a steel door into an existing house, and it is the difference between a one-day install and a masonry job.
It works even when the old door is nothing like the new one. On our Dripping Springs project, a pair of stained wood doors with small leaded panels came out and a black steel double door with a full-height transom went into the same opening. In Lakeway, wide-framed white patio doors were swapped for steel French doors across the same run.
Where an opening does need to be widened, or a structural header is involved, we tell you at the site visit. That is a bigger job and it may need a permit, and neither of those should be a surprise after you have paid a deposit.
The same crew installs everything we make, residential and commercial:
Glass, thermal performance and hardware are chosen per job. There is more on that under energy efficiency, glass options and locksets.
People do try it. The failures are always the same three:
None of the three are cheap to undo. A frame that has been anchored and sealed into masonry does not come back out gently.
The Austin metro is our home ground, and we install across the rest of Texas as well.
Not on the list? See all service areas or call us at (512) 773-4192 and we will tell you straight whether we cover you.
More answers on the general FAQ page, or read up on how to measure before your site visit.
GET YOUR FREE QUOTE